Built to Handle Traffic and Weather

Schedule Parking Lots in Lanesborough

Your business or property in Lanesborough depends on a parking lot that holds up under vehicle loads, manages snowmelt, and presents a safe, professional surface year-round. D Condron Construction Inc. handles every phase of commercial and multi-unit parking lot construction, from subgrade preparation and stone base installation through binder, surface asphalt, striping, and full ADA compliance.

We manage the complete scope: lot excavation, drainage integration with catch basins and swales, curb installation, and durable asphalt mixes engineered for heavier vehicle traffic. Whether you need resurfacing, full-depth reclamation, or a targeted patch-and-seal approach, we recommend solutions that match your existing pavement condition and budget. Our local knowledge ensures slope and drainage design that handles New England storms and snow-melt runoff without ponding or ice buildup.

Reach out today for an evaluation and phased plan to keep your lot operational during construction in Lanesborough.

What's Included in This Service

You get a turnkey process that begins with subgrade evaluation and treatment, followed by carefully compacted stone base layers that provide structural integrity. Our crews then place binder and surface asphalt in lifts, ensuring proper density and smoothness across the entire lot in Lanesborough.

D Condron Construction Inc. coordinates drainage work, including catch-basin placement and swale grading, before paving begins. We install curbing where required and apply thermoplastic striping and ADA-compliant markings once the surface cures. Asphalt mixes are selected for commercial load ratings, so your lot withstands delivery trucks, snowplows, and daily traffic.

If your existing pavement shows distress, we assess whether a mill-and-overlay, full reclamation, or spot repair delivers the best value. Each option is tailored to extend service life, control costs, and minimize downtime for tenants or customers.

How Our Process Works

Below are answers to common questions about parking lot construction, covering timelines, materials, and site-specific considerations for properties near Lanesborough.

How long does a full parking lot installation take?
Timeline depends on lot size and drainage complexity, but most commercial lots are completed in one to two weeks. You'll have access restored in phases to keep operations running.
What thickness of asphalt do you install?
Typical commercial lots receive a four- to six-inch stone base, two-inch binder, and one-and-a-half-inch surface course. Heavier-traffic areas may require deeper sections.
Can you work around existing tenants or business hours?
Yes, we stage construction in zones and schedule paving during off-peak hours or weekends to reduce impact on your customers and residents.
How do you handle drainage on sloped sites?
We install catch basins at low points, grade swales along edges, and design cross-slopes to direct water away from buildings. Proper slope prevents ice buildup during winter months.
Do you provide striping and ADA markings?
All projects include thermoplastic striping for parking stalls, directional arrows, and accessible-space markings that meet current ADA standards.

A well-built parking lot protects your investment and keeps liability low by maintaining safe, code-compliant surfaces for vehicles and pedestrians. Contact us for an evaluation and phased plan to keep your lot operational during construction.